0:35
Reinforcement work in top bar
Civil Works
Shared 1 week ago
0 views
0:21
Reinforcement work in raft bottom and top bar
0:17
Reinforcement work is going on in lift pit area
Shared 2 weeks ago
2 views
1:42
Piling work manually bore depth 18m in lift pit
Shared 3 weeks ago
7 views
0:46
Laying reinforcement bottom bar for raft
1 view
0:28
PCC work 30m3 from ready mix concrete
Shared 1 month ago
Soling work (300mm) at soling top surface -10m
0:33
Soling work is going on (300 mm)
Overall site and soling in lift pit
0:56
Soil passing through lower excavator to upper excavator
28 views
1:57
Overall site and Diaphragm wall UpTo -10.3m level from GL
54 views
1:16
Excavation UpTo -10meter on progress
Shared 2 months ago
19 views
Overall site view till now
Here is Diaphragm wall having 16meter depth
3 views
0:43
Excavation is going on UpTo -10m level
20 views
Ongoing site work
5 views
0:57
Excavation UpTo -10meter on progress. Here is overall site view
0:23
2nd layer struts erection on progress
0:50
Triangular brackets full welding
13 views
Second layer struts installation on progress
0:29
Installation of 2nd layer waller beam , cover plate and struts on progress
Shared 3 months ago
6 views
1:48
Excavation soil -6.5 m level from Road level and conveying it with help of excavator
Shared 4 months ago
142 views
0:32
Overall site view
4 views
1:01
Overall view of site and ongoing excavation
Shared 5 months ago
Piling Rebar Cage is ready
Shared 7 months ago
12 views
0:34
Concreting on Piling bore depth 30m #construction #highrisebuildings
0:27
For D-Wall, Rebar Cage is ready
Shared 8 months ago
40 views
0:54
139 views
0:07
Steps for preparation rebar cage
16 views
Site concreting work is going on smoothly
8 views
Rebar cage is ready for D-Wall
144 views
Made stirrups
360 views