JIEZOU POWER,act as a designer,manufacturer and installer of power system solution around the World,was founded in 1989 year,occupies 200,000 square meter.
JIEZOU POWER,mainly manages power grid projects,500KV EPC,230KV hydroelec-tric power plant,115KV power substation,etc.
JIEZOU POWER has own factory can manufacture from 2KV to 500KV 240MVA power transformer,GIS switchgear,substation,and ANSI/IEEE/DOE2016/CSA/IEC60076 stan-dard distribution transformers.
JIEZOU POWER successively obtain ISO9001,ISO14001,ISO45001,UL,CUL,CSA certificate;SGS,TUV,INTERTEK,TYPE TEST REPORT.
Until 2023 year,branch companies are distributed in United States,Canada,UK,Surina- me,UAE,Ethiopia,Philippines,Uzbekistan.And has branch factories and companies in BengBu city,FengYangcity,HaiAn city,XuZhou city,SuZhou city,ShenYang city,YanTai city,FoShan city in China.
JZP
【The State Council appointed HuaChunYing as Vice Minister of Foreign Affairs of the People's Republic of China.】
The adjustment of the diplomatic system continues.
On May 27, the Ministry of Human Resources and Social Security (Mohr) announced that The State Council appointed Hua Chunying as vice Minister of Foreign Affairs.Previously serving as Assistant Foreign Minister and Director-General of the Information Department, Hua is the longest-serving spokesperson in the history of the Ministry of Foreign Affairs.
At present, Hua Chunying ranks at the bottom of the five vice-ministers of the Foreign Ministry. She is also the youngest vice-minister of the Foreign Ministry, the first vice-minister of the post-70s generation, and the only woman in the current leadership of the Foreign Ministry.
Here,JZP congratulates Ms. Hua Chunying, and also hopes that our motherland-China will take the diplomatic road to a higher level in the future and become stronger and stronger.
1 year ago (edited) | [YT] | 0
View 0 replies