UPDATE: 13th July 2024- Paul Street Shopping Centre Lifts- They have the first call button on all the landings installed. At least it’s Schindler’s own parts and not generic parts. Also, they seem to have moved the indicators from the original locations. They must have been built into the frames of the lift doors. Also, the new call buttons are a bit lower down that the Pickerings ones. The first lift should be ready soon (I think?)
europa2000man
UPDATE: 13th July 2024- Paul Street Shopping Centre Lifts- They have the first call button on all the landings installed. At least it’s Schindler’s own parts and not generic parts. Also, they seem to have moved the indicators from the original locations. They must have been built into the frames of the lift doors. Also, the new call buttons are a bit lower down that the Pickerings ones. The first lift should be ready soon (I think?)