On April 14th 2025, I get to go see the J Street Railroad Crossing on the Union Pacific Sacramento Subdivision main line track in Midtown Sacramento. It had interesting crossing equipments on it as it has Progress Rail Light Frames that are flat instead of being shaped like a cone and a Progress Rail/Lincoln Industries Cantilever on it. It even features Progress Rail LEDs that are sometimes installed on these cantilevers around 2004 and 2005. Sadly, there were no trains running through this line as I waited around 20 to 30 minutes to get a train at this crossing. I tried to get a video of a freight train passing through these crossings in Midtown Sacramento section but none of them came to my area. I got some more light rail train action around 16th Street station after getting out of Union Pacific Sacramento Subdivision in Midtown section of Sacramento.
UnionPacific-Fan197
On April 14th 2025, I get to go see the J Street Railroad Crossing on the Union Pacific Sacramento Subdivision main line track in Midtown Sacramento. It had interesting crossing equipments on it as it has Progress Rail Light Frames that are flat instead of being shaped like a cone and a Progress Rail/Lincoln Industries Cantilever on it. It even features Progress Rail LEDs that are sometimes installed on these cantilevers around 2004 and 2005. Sadly, there were no trains running through this line as I waited around 20 to 30 minutes to get a train at this crossing. I tried to get a video of a freight train passing through these crossings in Midtown Sacramento section but none of them came to my area. I got some more light rail train action around 16th Street station after getting out of Union Pacific Sacramento Subdivision in Midtown section of Sacramento.
7 months ago | [YT] | 1