UPDATE: Paul Street Shopping Centre Lift Replacements- Saturday 8th June 2024
The cab and cables (belts by the looks of it) are in place. They have shaft doors on the 3rd floor put in (not sure if they are going to have the same two speed door arrangement as the Pickerings ones or whether they will have centre closing doors.
Still a bit to go, but the longer it takes the better (in my opinion).
europa2000man
UPDATE: Paul Street Shopping Centre Lift Replacements- Saturday 8th June 2024
The cab and cables (belts by the looks of it) are in place. They have shaft doors on the 3rd floor put in (not sure if they are going to have the same two speed door arrangement as the Pickerings ones or whether they will have centre closing doors.
Still a bit to go, but the longer it takes the better (in my opinion).
1 year ago | [YT] | 8