April 1st saw the peak of the barn pulled aside and partially disassembled as well as the remainder of the south slope of the roof removed from the rubble using my 3 ton floor back and brute strength. Then after getting everything away from the still partially upright section of the front wall I went inside and ran some trains on the modular layout.
CP368 Productions
April 1st saw the peak of the barn pulled aside and partially disassembled as well as the remainder of the south slope of the roof removed from the rubble using my 3 ton floor back and brute strength.
Then after getting everything away from the still partially upright section of the front wall I went inside and ran some trains on the modular layout.
1 month ago | [YT] | 6