22:35
Little update on the new building. laying the floor form...Some pre planning.
BILLSTMAXX
10:41
Update of me and new the building floor.
41:36
Kubota K-008 Mini Ex gravel level and tampering...Broken hand
2:23:26
Concrete day....Lets get pouring the new floor
19:15
All drunked up cutting lines in the new pad
36:35
Lets try the next cuts with the water on...Any different??
28:09
Time to pull the form off the new floor...Lets do it smart not hard
49:37
SHOP UPDATE.....1st wall ready to go up and bolt down
1:31:52
New shop wall build and set up
31:35
New Nail Gun to play with and installing blocks
16:59
New building project update.
1:19:44
Last wall is up...Let's lag it down and hang a sheet on the east wall
43:58
Installing the last top plates.....LONG way up
39:55
We need to do some excavating at the base of the wall...Kubota K-008
38:40
Doing some sheet reinforcement in the new building
1:23:42
Nice cedar on the mill...Cutting some corner siding strapping
2:01:30
New Building update!!...Homemade cedar siding cut and install
8:40
Trusses showed up today...YAY!!!
56:53
This will make working in the new building SO much better and safer
37:54
Let's try a new Milwaukee toy and install some truss supports
16:27
Let’s check out things after the big storm
2:41:57
Installing trusses and sheathing the roof
1:11:41
Hammerin on Hurricane ties and story time.. Finger smash..Awesome
3:16:02
Finishing the roof sheathing and applying the underlay material
1:43:36
New insulated 10x10 door ordered...We need to do a bit of framing work for the rails
1:03:14
Short road to build to roll scaffold on..Backhoe and plate tamper work
30:06
Ridgid impact driver went for a crap...We got a smokin hot deal on a new RED set
16:18
Steel roof installation update.
1:03:50
The final part of the tyvek Wrap on the new building....YAY!!!!
1:21:28
Hanging J chanel and soffit for the new building
1:07:14
New Building UPDATE!!....Last step for the overhang...Placing the fascia
2:12:17
Up and down the ladder a million times....Hanging cedar siding
1:25:18
IT'S HERE...IT'S HERE...IT'S HERE...10' GARAGE DOOR INSTALL ON THE NEW SHOP
1:53:42
Milling some fresh cedar siding and ripping one flat edge
1:04:19
Nice Wide (biggest yet) cedar on the mill cutting some more siding
6:22
Siding update. Phew. That sides done.
36:57
Sealing up with some Thermoplastic sealant..Cool stuff
1:26:35
Into the bush for a pair of cedars
1:39:36
Let's finish off the last of the south end cedar siding
30:51
Picked up some electrical supplies and a really cool item to unbox
56:01
Measuring and drilling through both buildings to run a electrical wire pipe through
1:09:24
Running Armoured wire to the mounted boxes
1:15:26
Hooking up wires in boxes and "tested" The grounding circuit oopsie
2:09:16
Milling some pine for a soon project and placing the last of the siding...YAYY!!!!
1:03:10
Running the first run of wiring to the east wall
2:01:16
Running and hooking up the East wall power and installing the central vac
1:16:06
Working in the rafters installing air flow vents and blocking
1:13:34
Up..Foam sealing the blocking in the rafters and testing out 1 ceiling light.Found some sweet deals
1:55:24
3D print custom air hose clips and installing the compressed air into the new building
1:15:49
Back into the rafters...Sealing up and looking at blown in Insulation R value
1:49:42
Finishing the last of the wiring up....YAY!
1:03:15
Installing a new extension cord reel and looking into hatch access
1:26:28
Think before we put up the vapour barrier plastic we should run one more line for a heat pump
1:22:17
PLASTIC ON THE ROOF SUCKS.....But lets get it done
54:55
Do you know what Acousti-Seal is??? Check this out
1:08:30
Hoisting up panels...Work on the ceiling....Oh fun lol
1:50:32
Measuring cutting and nailing the last of the roof OSB
1:26:53
Let's get into some Nice Light Work in the new shop (CUSTOM MADE TOOL)
42:54
Need to cut and fit the 2-4 foot pieces for the ceiling