Our goal is to create this channel. That every engineer who involves in the project field needs planning at every step. And this software is very important for learning planning. And In sha Allah I will explain every step of how you can become a successful planning engineer. I will explain what is the responsibility of the planning engineer to do it
How the project is scheduled
How the project is monitored
What is project management?
I will explain to you in full detail the five steps of project management that are very important. And he's writing down the steps.
01- PLANNING
02- MONITORING
03- MANAGING
04- CONTROLLING
05- REPORTING
And if anyone has any problem at all, feel free to contact me on the What's App or by email.
We are also providing trainings, please contact us for more details.
PLANNING - P6
💻🔎 PRIMAVERA P6 HISTOGRAM TUTORIAL
💻🔎 EXCEL & P6 HISTOGRAMS REMAINING EARLY, LATE & BUDGETED EXPLAINED
🕒DURATION: 32 MINUTES
🎞️TUTORIAL: https://youtu.be/fHKlTGmGe14
📢📑DESCRIPTION:
Master Primavera P6 like a pro with this comprehensive tutorial on customizing histograms for Remaining Early, Remaining Late, Budgeted, and Actual Units. This step-by-step guide is designed for Planning Engineers, Schedulers, and Project Controls professionals across all industries, including construction, manufacturing, oil & gas, energy, and more. Learn how to create fully customizable histograms, adjust colors, curves, bars, and filters, and export your data to Excel for advanced reporting and visualization. Discover how to manage activity usage profiles, resource assignments, phase-wise project tracking, and calculate averages from remaining early and late units. This tutorial also covers earned value curves, baseline comparisons, and professional reporting techniques, enabling you to present your project data clearly and efficiently. Plus, get access to the Excel histogram template to implement these techniques immediately. Whether your project is large or small, this tutorial provides the tools and methods to streamline project tracking and enhance decision-making across any industry.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PrimaveraP6Tutorial #PrimaveraHistogram #ProjectControls #ProjectPlanning #ConstructionPlanning #PrimaveraTraining #P6Scheduler #PrimaveraP6Tips #PrimaveraExcel #PrimaveraP6Histogram #ResourceManagement #ProjectScheduler #PrimaveraP6Training #PrimaveraP6Schedule #PrimaveraP6CostControl #PrimaveraPlanning #PrimaveraSchedule #PrimaveraP6Advanced #PrimaveraResourceProfile #PrimaveraCurves #PrimaveraProjectControls #ExcelIntegration #ResourceUsageProfile #PrimaveraP6Customization #ProjectTracking #PlanningEngineer #SchedulerTutorial #ProjectManagementSoftware #HistogramTutorial #ProjectVisualization https://youtu.be/fHKlTGmGe14
11 hours ago | [YT] | 0
View 0 replies
PLANNING - P6
💻🔎 DELAY ANALYSIS USING MULTIPLE SIMULATION TECHNIQUE, LOGIC OVERRIDE, AND QUICK TIA FOR ENTIRE PROJECT
🕒DURATION: 21 MINUTES
🎞️TUTORIAL: https://youtu.be/GlEq0wfTVlA
📢📑DESCRIPTION:
Welcome to Planning P6, your trusted platform for professional project controls and scheduling tutorials. In this session, we cover the Hybrid Window and Time Impact Analysis (TIA) Method under AACE International Recommended Practices (RP 29R-03 and 52R-06) a powerful and defensible approach for conducting delay analysis in Primavera P6. You’ll learn how to combine window analysis and time impact analysis using a multiple simulation (hybrid) technique for accurate and transparent Extension of Time (EOT) assessment. This tutorial demonstrates practical steps including setting up monthly window analysis, performing TIA with logic override, managing multiple calendars, resolving out-of-sequence activities, and preparing pre- and post-impact schedules. Real project examples illustrate how this method benefits both clients and contractors by ensuring fairness, transparency, and compliance with AACE and PMS standards. The video also explains how to apply the quick TIA technique when the entire project is affected, ensuring reliable and defensible delay evaluation. Ideal for planning engineers, delay analysts, and project control professionals, this tutorial strengthens your understanding of hybrid delay assessment in Primavera P6.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #DelayAnalysis #TimeImpactAnalysis #WindowAnalysis #HybridMethod #AACE #ExtensionOfTime #ProjectControls #ConstructionClaims #PlanningP6 #PrimaveraTutorial #ProjectManagement #ForensicDelayAnalysis #ProgressOverride #WindowsMethod #P6Scheduling #EngineeringManagement #HybridDelayAnalysis #EOTAssessment #ConstructionPlanning #ScheduleAnalysis #ProjectScheduling #ContractorClaims #ClientControls #ScheduleManagement #P6Training #ConstructionProjectManagement #DelayAssessment #MultipleSimulationTechnique #ProjectPlanning #PlanningP6 https://youtu.be/GlEq0wfTVlA
2 days ago | [YT] | 0
View 0 replies
PLANNING - P6
💻🔎 COMPLETE TUTORIAL HOW TO PREPARE EXTENSION OF TIME CLAIMS
💻🔎 HOW TO PREPARE DELAY ANALYSIS | #WIA_TIA
🕒DURATION: 02 HOURS 15 MINUTES
🎞️TUTORIAL: https://youtu.be/T3E2BDGdL5E
📢📑DESCRIPTION:
In this comprehensive tutorial, we have meticulously detailed every step involved in the delay analysis process, from initiation to completion. The guide delves into the nuances of window impact Analysis, time impact Analysis, and the distinction between compensable and non-compensable delays, as well as compensable and excusable/non-excusable delays. Furthermore, the tutorial provides practical insights on maintaining daily logs, sourcing delay diaries, integrating them into Primavera P6, and visualizing their impact on the project schedule.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#delayanalysis #EOT #detiled_WIA_TIA_EOT_Claims #DelayClaims #ImpactAnalysis #ProjectDelays #ContractAdministration #ConstructionClaims #ProjectControlsTutorial #PrimaveraP6 #ProjectManagement #DelayAnalysis #WIA #TIA #Construction #Engineering #ProjectControls #ProjectScheduling #ExtensionOfTime #EOTClaims #PrimaveraP6Tutorial #P6Tutorial #P6Training #ProjectManagement #ExtensionOfTimeClaims #ConstructionClaims #DelayAnalysis #PrimaveraP6 #ProjectManagement #ConstructionLaw #ContractManagement #ProjectControls #ClaimPreparation #Construction #ProjectScheduling #ScheduleAnalysis #CriticalPathMethod #TimeImpactAnalysis #TimeImpactAnalysis #ImpactAnalysis #WindowImpactAnalysis #ImpactAssessment https://youtu.be/T3E2BDGdL5E
1 week ago | [YT] | 0
View 0 replies
PLANNING - P6
💻🔎 COMPLETE TUTORIAL WHAT IS RESOURCE LOADING IN P6
💻🔎 HOW TO CALCULATE RESOURCES
💻🔎 PRODUCTIVITY RATES
🕒DURATION: 01 HOUR & 50 MINUTES
🎞️TUTORIAL: https://youtu.be/1WgKABEe-6c
📢📑DESCRIPTION:
Learn the complete workflow of resource loading, productivity setup, and cost planning in Primavera P6 using a clean, practical method. This tutorial shows you how to calculate labor, equipment, and material requirements, prepare a resource sheet in Excel, build accurate productivity-based durations, apply crew production, assign costs, and upload everything smoothly into Primavera P6. You’ll also see how to review resource usage, staffing, consumption, and histograms the way professional planners do. A simple, clear guide to mastering resource-driven scheduling in Primavera P6. Resource loading = hours of work per time period / hours of capacity per time period.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PlanningP6 #resourcecalculation #resourseloading #ProductivityRates #ProjectManagement #ProjectControls #ProjectPlanning #ResourceAllocation #ResourceManagement #CalculateResources #DetermineProductivity #ResourceOptimization #ResourcePlanning #ResourceLeveling #ResourceCapacity #ResourceUtilization #ProductivityMetrics #EfficiencyMetrics #ProjectPerformance #ProjectCost #ProjectDuration #ProjectTimeline #ProjectRisk #ProjectChange #ConstructionPlanning #EPCProjects #Scheduling #ManpowerPlanning #PlanningEngineer #ExcelToP6 #ResourceSheet #P6Training #PlanningAndScheduling #PlanningP6Tutorials https://youtu.be/1WgKABEe-6c
1 week ago | [YT] | 1
View 0 replies
PLANNING - P6
💻🔎 PRIMAVERA P6 BASELINE EXPLAINED
💻🔎 PRIMARY BASELINE VS PROJECT BASELINE | CHANGE BASELINE TYPES
🕒DURATION: 19 MINUTES
🎞️TUTORIAL: https://youtu.be/tEqA4law-6U
📢📑DESCRIPTION:
In this detailed tutorial, we cover one of the most essential topics, the complete difference between Primary Baseline and Project Baseline in Primavera P6. This professional session explains in depth what a baseline is, how primary and project baseline’s function, and why understanding their purpose is crucial for effective project tracking, performance measurement, and earned value analysis. You will also learn how to create, assign, and maintain baselines, how to modify and customize baseline types according to project needs, and how to configure admin settings for baseline limits and data preferences.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PrimaveraP6Tutorial #PrimaveraP6Baseline #PrimaryVsProjectBaseline #BaselineInPrimaveraP6 #ProjectBaseline #PrimaryBaseline #BaselineManagement #MaintainBaseline #AssignBaseline #BaselineTypes #ModifyBaselineTypes #BaselineSettings #BaselineConfiguration #PrimaveraP6AdminSettings #BaselineExport #ExportBaseline #PrimaveraP6Tips #PrimaveraP6Training #PrimaveraP6Course #ProjectPlanning #ProjectScheduling #ConstructionPlanning #ConstructionScheduling #PlanningEngineer #Scheduler #EarnedValueAnalysis #EVAinPrimaveraP6 #PerformanceTracking #ProjectControl #ScheduleTracking #PrimaveraP6ForBeginners #PrimaveraP6Advanced #BaselineLimitSettings #BaselineComparison #BaselineAnalysis #AdminPreferencesP6 #PrimaveraP6Projects #PrimaveraP6Explained #PrimaveraP6ForEngineers #PrimaveraP6Learning #PlanningP6 #PlanningP6Channel #ProjectManagement #PrimaveraTutorials #P6Baselines #planningp6 https://youtu.be/tEqA4law-6U
3 weeks ago | [YT] | 1
View 0 replies
PLANNING - P6
💻🔎 BEST METHOD FOR COST LOADING PRIMAVERA P6
💻🔎 RESOURCES VS EXPENSES EXPLAINED | HOW TO DO COST LOADING
🕒DURATION: 28 MINUTES
🎞️TUTORIAL: https://youtu.be/K7tcN2zUWsY
📢📑DESCRIPTION:
Cost loading in Primavera P6 is one of the most critical steps in effective project planning and cost management. In this tutorial, we provide a complete and professional guide to cost loading, explaining in detail the two available methods: Resource-based cost loading and Expense-based cost loading.
While the process of assigning costs as resources or expenses has already been explained in our previous tutorials, this video takes a deeper look at the comparison, advantages, and limitations of each method.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #CostLoading #ProjectManagement #ResourceCost #ExpenseCost #CostManagement #CashFlowManagement #EarnedValueManagement #EVMinP6 #SCurves #PrimaveraTutorial #ProjectPlanning #ProjectControls #BudgetManagement #ConstructionPlanning #P6Tips #ProjectScheduler #CostTracking #ResourceVsExpenses #ProjectBudgeting #ProjectPlanner #ConstructionManagement #PrimaveraP6Tips #ActivityCodes #ProjectAccounting #CostAnalysis #ProjectFinance #ProjectExecution #ProjectReporting #P6CostLoading #PrimaveraP6Tutorial #BestCostLoadingMethod #ResourcesVsExpenses #ProjectManagementTips #P6CostManagement #CashFlowTips #EarnedValueAnalysis #CostLoadingExplained #ProjectPlannerGuide #ProjectFinanceTips #P6ResourceCost #ProjectBudgetManagement #CostLoadingBestPractices #ProjectControlsTips #ProjectCostAnalysis #EarnedValueManagementTips #P6CashFlowManagement #PlanningP6 https://youtu.be/K7tcN2zUWsY
1 month ago | [YT] | 4
View 2 replies
PLANNING - P6
💻🔎 HOW TO IMPORT & UPDATE PROGRESS FROM MS PROJECT INTO PRIMAVERA P6
💻🔎 UPDATE PROGRESS, ACTUALS MSP P6
🕒DURATION: 20 MINUTES
🎞️TUTORIAL: https://youtu.be/c8MYMJV620U
📢📑DESCRIPTION:
This comprehensive tutorial demonstrates a step-by-step method for updating project progress from Microsoft Project (MS Project) into Primavera P6. In many organizations, project teams work in MS Project, while clients or management require deliverables in Primavera P6. This video provides the most efficient and reliable workflow to transfer progress data seamlessly, ensuring accuracy and consistency across platforms.
What you will learn in this session:
👉🏻 How to extract Actual Start, Actual Finish, and Percent Complete from MS Project
👉🏻 Best practices for preparing and cleaning your data in Excel for smooth integration
👉🏻 How to apply Excel functions such as VLOOKUP and TRIM to eliminate errors
👉🏻 Step-by-step guidance to export and import progress into Primavera P6 correctly
👉🏻 Practical tips for handling baselines, milestones, and alternative update methods
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #MSProject #UpdateProgress #PrimaveraTutorial #PrimaveraTraining #PrimaveraTips #PrimaveraGuide #PrimaveraUpdate #PrimaveraProgressUpdate #PrimaveraExcel #PrimaveraImport #PrimaveraVlookup #PrimaveraData #PrimaveraForBeginners #PrimaveraProfessional #PrimaveraLearning #PrimaveraSchedule #PrimaveraControls #ProjectControls #ProjectScheduler #PlanningEngineer #ProjectPlanning #ConstructionPlanning #ProjectManagementTools #EarnedValueManagement #PrimaveraActivities #PrimaveraBaseline #MSProjectToPrimavera #PrimaveraIntegration #PrimaveraCourse #PlanningP6 https://youtu.be/c8MYMJV620U
2 months ago | [YT] | 2
View 0 replies
PLANNING - P6
💻🔎 PRIMAVERA P6 HISTOGRAM TUTORIAL
💻🔎 EXCEL & P6 HISTOGRAMS REMAINING EARLY, LATE & BUDGETED EXPLAINED
🕒DURATION: 32 MINUTES
🎞️TUTORIAL: https://youtu.be/fHKlTGmGe14
📢📑DESCRIPTION:
Master Primavera P6 like a pro with this comprehensive tutorial on customizing histograms for Remaining Early, Remaining Late, Budgeted, and Actual Units. This step-by-step guide is designed for Planning Engineers, Schedulers, and Project Controls professionals across all industries, including construction, manufacturing, oil & gas, energy, and more. Learn how to create fully customizable histograms, adjust colors, curves, bars, and filters, and export your data to Excel for advanced reporting and visualization. Discover how to manage activity usage profiles, resource assignments, phase-wise project tracking, and calculate averages from remaining early and late units. This tutorial also covers earned value curves, baseline comparisons, and professional reporting techniques, enabling you to present your project data clearly and efficiently. Plus, get access to the Excel histogram template to implement these techniques immediately. Whether your project is large or small, this tutorial provides the tools and methods to streamline project tracking and enhance decision-making across any industry.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PrimaveraP6Tutorial #PrimaveraHistogram #ProjectControls #ProjectPlanning #ConstructionPlanning #PrimaveraTraining #P6Scheduler #PrimaveraP6Tips #PrimaveraExcel #PrimaveraP6Histogram #ResourceManagement #ProjectScheduler #PrimaveraP6Training #PrimaveraP6Schedule #PrimaveraP6CostControl #PrimaveraPlanning #PrimaveraSchedule #PrimaveraP6Advanced #PrimaveraResourceProfile #PrimaveraCurves #PrimaveraProjectControls #ExcelIntegration #ResourceUsageProfile #PrimaveraP6Customization #ProjectTracking #PlanningEngineer #SchedulerTutorial #ProjectManagementSoftware #HistogramTutorial #ProjectVisualization https://youtu.be/fHKlTGmGe14
3 months ago | [YT] | 3
View 0 replies
PLANNING - P6
💻🔎 HOW TO PREPARE SCHEDULE NARRATIVE REPORT
💻🔎 WHAT IS SCHEDULE NARRATIVE REPORT?
💻🔎 SCHEDULE NARRATIVE
🕒DURATION: 16 MINUTES
🎞️TUTORIAL: https://youtu.be/LGyYnpYxqvs
📢📑DESCRIPTION:
A schedule narrative report is one of the most important supporting documents in project planning, yet many planners overlook its true value. In this tutorial, I explain what a schedule narrative report is, why it matters, and how to prepare one step by step in Primavera P6. Unlike a simple Gantt chart that only shows dates and durations, the narrative explains the logic, assumptions, constraints, and risks behind the schedule. It tells the story of your project, giving clarity to clients and stakeholders, and it provides justification for delays, changes, and recovery strategies. More than just paperwork, it is a communication tool that builds trust, supports claims, and strengthens decision-making. In this session, you will learn the key requirements of a professional narrative, how client-specific standards impact its format, and what should always be included to make it meaningful. I will also share real examples of narrative reports and provide downloadable templates from PlanningP6.com that you can customize for your own projects. By the end of this tutorial, you will have a clear understanding of how to create a schedule narrative report that improves project communication, supports dispute resolution, and gives management the confidence to move forward with informed decisions. If you find this video useful, please like, share, comment, and subscribe for more Primavera P6 tutorials and professional planning insights.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #ScheduleNarrativeReport #ProjectManagement #ConstructionPlanning #PlanningEngineer #BaselineSchedule #RecoverySchedule #RevisedSchedule #ProjectControls #ScheduleManagement #ProjectScheduling #ConstructionProjects #PlanningP6 #EPCMProjects #CriticalPathAnalysis #ProjectPlanningTips #PrimaveraTutorial #ProjectMonitoring #DelayAnalysis #ScheduleOptimization https://youtu.be/LGyYnpYxqvs
4 months ago | [YT] | 4
View 0 replies
PLANNING - P6
💻🔎 HOW TO DISPLAY GANTT CHART, RESOURCE ASSIGNMENT & ACTIVITY USAGE UP TO A SPECIFIC DATE PRIMAVERA P6
🕒DURATION: 10 MINUTES
🎞️TUTORIAL: https://youtu.be/rg72kC9SjwQ
📢📑DESCRIPTION:
In this Primavera P6 tutorial, we will learn how to display project progress, activities, Gantt charts, and resource usage up to any specific date without deleting or losing data. This step-by-step guide covers two practical methods:
👉🏻Using Filters – to view activities and progress until a chosen date.
👉🏻Using Print/Page Setup Options – to generate client-ready reports up to a defined date.
This feature is especially useful when management, clients, or stakeholders request project updates for a specific milestone, month, or cut-off date. By following this tutorial, you will be able to generate accurate and professional progress reports tailored to any custom requirement in Primavera P6.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #ProjectScheduling #ConstructionPlanning #PrimaveraTutorial #ProjectManagement #PlanningEngineer #ScheduleControl #GanttChart #ProjectProgress #EngineeringProjects #P6Tips #ResourceManagement #PrimaveraFilters #ActivityUsage #ResourceUsage #ProgressReporting #BaselineManagement #ProjectControl #ProjectReporting #ConstructionProjects #PrimaveraTraining #ProjectTracking #ScheduleAnalysis #PrimaveraTips #ClientReporting #PrimaveraP6Training #PrimaveraP6Tips #PrimaveraP6Tutorial #PrimaveraP6ForBeginners #PrimaveraP6Projects https://youtu.be/rg72kC9SjwQ