Our goal is to create this channel. That every engineer who involves in the project field needs planning at every step. And this software is very important for learning planning. And In sha Allah I will explain every step of how you can become a successful planning engineer. I will explain what is the responsibility of the planning engineer to do it
How the project is scheduled
How the project is monitored
What is project management?
I will explain to you in full detail the five steps of project management that are very important. And he's writing down the steps.
01- PLANNING
02- MONITORING
03- MANAGING
04- CONTROLLING
05- REPORTING

And if anyone has any problem at all, feel free to contact me on the What's App or by email.

We are also providing trainings, please contact us for more details.


PLANNING - P6

💻🔎 HOW TO PREPARE SCHEDULE NARRATIVE REPORT
💻🔎 WHAT IS SCHEDULE NARRATIVE REPORT?
💻🔎 SCHEDULE NARRATIVE

🕒DURATION: 16 MINUTES
🎞️TUTORIAL: https://youtu.be/LGyYnpYxqvs

📢📑DESCRIPTION:

A schedule narrative report is one of the most important supporting documents in project planning, yet many planners overlook its true value. In this tutorial, I explain what a schedule narrative report is, why it matters, and how to prepare one step by step in Primavera P6. Unlike a simple Gantt chart that only shows dates and durations, the narrative explains the logic, assumptions, constraints, and risks behind the schedule. It tells the story of your project, giving clarity to clients and stakeholders, and it provides justification for delays, changes, and recovery strategies. More than just paperwork, it is a communication tool that builds trust, supports claims, and strengthens decision-making. In this session, you will learn the key requirements of a professional narrative, how client-specific standards impact its format, and what should always be included to make it meaningful. I will also share real examples of narrative reports and provide downloadable templates from PlanningP6.com that you can customize for your own projects. By the end of this tutorial, you will have a clear understanding of how to create a schedule narrative report that improves project communication, supports dispute resolution, and gives management the confidence to move forward with informed decisions. If you find this video useful, please like, share, comment, and subscribe for more Primavera P6 tutorials and professional planning insights.

🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#PrimaveraP6 #ScheduleNarrativeReport #ProjectManagement #ConstructionPlanning #PlanningEngineer #BaselineSchedule #RecoverySchedule #RevisedSchedule #ProjectControls #ScheduleManagement #ProjectScheduling #ConstructionProjects #PlanningP6 #EPCMProjects #CriticalPathAnalysis #ProjectPlanningTips #PrimaveraTutorial #ProjectMonitoring #DelayAnalysis #ScheduleOptimization https://youtu.be/LGyYnpYxqvs

2 days ago | [YT] | 4

PLANNING - P6

💻🔎 HOW TO DISPLAY GANTT CHART, RESOURCE ASSIGNMENT & ACTIVITY USAGE UP TO A SPECIFIC DATE PRIMAVERA P6

🕒DURATION: 10 MINUTES
🎞️TUTORIAL: https://youtu.be/rg72kC9SjwQ

📢📑DESCRIPTION:

In this Primavera P6 tutorial, we will learn how to display project progress, activities, Gantt charts, and resource usage up to any specific date without deleting or losing data. This step-by-step guide covers two practical methods:

👉🏻Using Filters – to view activities and progress until a chosen date.
👉🏻Using Print/Page Setup Options – to generate client-ready reports up to a defined date.

This feature is especially useful when management, clients, or stakeholders request project updates for a specific milestone, month, or cut-off date. By following this tutorial, you will be able to generate accurate and professional progress reports tailored to any custom requirement in Primavera P6.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#PrimaveraP6 #ProjectScheduling #ConstructionPlanning #PrimaveraTutorial #ProjectManagement #PlanningEngineer #ScheduleControl #GanttChart #ProjectProgress #EngineeringProjects #P6Tips #ResourceManagement #PrimaveraFilters #ActivityUsage #ResourceUsage #ProgressReporting #BaselineManagement #ProjectControl #ProjectReporting #ConstructionProjects #PrimaveraTraining #ProjectTracking #ScheduleAnalysis #PrimaveraTips #ClientReporting #PrimaveraP6Training #PrimaveraP6Tips #PrimaveraP6Tutorial #PrimaveraP6ForBeginners #PrimaveraP6Projects https://youtu.be/rg72kC9SjwQ

1 week ago | [YT] | 1

PLANNING - P6

💻🔎 CRITICAL PATH METHOD (CPM) & ANALYSIS IN PRIMAVERA P6
💻🔎 HOW TO FIND & ANALYZE THE CRITICAL PATH P6

🕒DURATION: 28 MINUTES
🎞️TUTORIAL: https://youtu.be/vhovD4JnA1M

📢📃📑DESCRIPTION:

In this video, we provide a complete guide on the Critical Path Method (CPM) and Critical Path Analysis in Primavera P6, one of the most important concepts in project management and construction scheduling. Using a real building project example, we explain step by step how to identify the critical path, analyze CPM scheduling, calculate float, and differentiate between critical and non-critical activities in Primavera P6. You will also learn how to use built-in filters, customize the Gantt chart, apply the longest path option, and generate professional reports for clients and management. The critical path represents the longest sequence of dependent activities that determines the minimum project duration. Any delay on the critical path directly impacts the project completion date, making it essential for planners, schedulers, and project managers to monitor and control it effectively.

🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#PrimaveraP6 #CriticalPathMethod #CPMScheduling #CriticalPathAnalysis #PrimaveraP6Tutorial #ProjectManagement #ConstructionScheduling #ProjectPlanning #PrimaveraP6Training #HowToFindCriticalPathInPrimavera #GanttChartInPrimaveraP6 #CriticalVsNonCriticalActivities #FloatManagementInPrimavera #LongestPathInProjectScheduling #ResourceCriticalPath #NearCriticalPathAnalysis #PrimaveraSchedulingTips #ProjectControls #PlanningEngineer #ConstructionProjectManagement #TimeManagementInProjects #PrimaveraP6StepByStep #BuildingProjectScheduling #PrimaveraP6CriticalPathExample #PlanningP6

https://youtu.be/vhovD4JnA1M

3 weeks ago | [YT] | 5

PLANNING - P6

💻🔎 HOW TO CREATE DASHBOARDS, FLASH REPORTS & PROGRESS REPORTS IN EXCEL FROM PRIMAVERA P6 DATA

🕒DURATION: 19 MINUTES
🎞️TUTORIAL: https://youtu.be/nHK3bTCIFTs

📢📑DESCRIPTION:

Discover how to transform Primavera P6 data into professional dashboards and progress reports within minutes using our semi-automatic Excel dashboard templates. At PlanningP6.com, we provide ready-to-use formats that allow you to generate daily, weekly, monthly, or even annual project reports with just a few clicks.
With these templates, you only need to set up 20% of the data at the beginning of your project. After that, you simply copy and paste your updated Primavera P6 schedule data into Excel, and the dashboard will refresh automatically using built-in formulas and VLOOKUP functions. The templates include:

🌟 Project Health & Progress Status
🌟 Cost & Budget Tracking
🌟 Milestone Performance (Planned vs. Actual)
🌟 Schedule Performance Index (SPI) & Cost Performance Index (CPI)
🌟 S-Curves and Histograms (Cost, Units, or Quantities)
🌟Look-ahead Schedules (e.g., 2-Week Look-Ahead)

🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#PrimaveraP6 #ProjectManagement #ConstructionPlanning #ProjectDashboard #ProgressReports #ExcelDashboard #ProjectControls #ScheduleManagement #CostManagement #ProjectTracking #P6Templates #ConstructionProjects #EarnedValueManagement #PMOTools #ConstructionScheduler #ProjectPlanningSoftware #ProjectMonitoring #ManagementTools #ConstructionManagement #PrimaveraP6 #ProjectManagement #ExcelDashboard #ProjectControls #ProgressReports #ScheduleManagement #ConstructionPlanning #CostManagement #ProjectTracking #ProjectReporting #planningp6 https://youtu.be/nHK3bTCIFTs

1 month ago | [YT] | 2

PLANNING - P6

💻🔎 HOW TO CONVERT AN UPDATED SCHEDULE TO BASELINE IN PRIMAVERA P6
💻🔎 REMOVE ACTUALS AND PROGRESS EASILY

🕒DURATION: 21 MINUTES
🎞️TUTORIAL: https://youtu.be/vRbjC4jNfyc

📢📑DESCRIPTION:

Learn how to quickly create a clean baseline from an updated Primavera P6 schedule using two proven methods—Manual Updates and Global Change. I’ll show you how to remove actual dates, clear % complete, and reset progress without losing your schedule data. Perfect for construction, oil & gas, infrastructure, and EPC planners who want accurate baselines in Primavera P6.

🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#PrimaveraP6 #PrimaveraTutorial #P6Baseline #ConstructionPlanning #ProjectManagement #BaselineFromUpdatedSchedule #PrimaveraTips #RemoveActualsP6 #P6GlobalChange #BaselineCreation #PrimaveraTraining #PlanningEngineer #CreateBaselineInP6 #ResetProgressPrimaveraP6 #RemoveActualsPrimaveraP6 #ClearPercentCompleteP6 #PrimaveraP6GlobalChange #UpdatedScheduleToBaseline #PrimaveraP6ScheduleControl #BaselineCreationTutorial #PrimaveraP6Planning #P6ProgressReset #PrimaveraP6ProjectManagement #ConstructionSchedulingP6 #PrimaveraP6ForBeginners #planningp6 https://youtu.be/vRbjC4jNfyc

1 month ago | [YT] | 1

PLANNING - P6

💻🔎 HOW TO RESOLVE START & FINISH TIME ERROR PRIMAVERA P6
💻🔎START & FINISH TIME MISMATCH WITH CALENDAR

🕒DURATION: 16 MINUTES
🎞️TUTORIAL: https://youtu.be/OFLT3J9pm6c

📢📑DESCRIPTION:


n this detailed Primavera P6 tutorial, we address a common issue where activity start and finish times do not align with the project calendar. Many planners and schedulers face situations where activities begin at 8:00 AM or end before the expected working hours, even though the calendar is set correctly.

This video explains the three major causes of this problem:

🔴Decimal values in original duration
🔴Decimal lag values in activity relationships
🔴Use of multiple or misaligned calendars

🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#PrimaveraP6 #PrimaveraP6Tutorial #P6CalendarIssue #P6StartTimeMismatch #P6FinishTimeMismatch #PrimaveraP6StartTime #PrimaveraP6Schedule #P6TimeMismatch #P6DurationIssue #P6DecimalDuration #PrimaveraP6Tips #P6LagTimeIssue #P6ScheduleCalendar #P6ActivityMismatch #FixP6StartTime #P6TimeAlignment #PrimaveraCalendarFix #ActivityStartTimeIssue #P6TimeRoundingProblem #PrimaveraP6DurationFix #PlanningP6 https://youtu.be/OFLT3J9pm6c

1 month ago | [YT] | 0

PLANNING - P6

Hiring – Planning Engineer (UCH-II - OGDCL Project)

AJC Company (OGDCL Project) Location, Balochistan, Pakistan requires a Planning Engineer.

🌟Salary: Up to PKR 100000-140000 (depends on experience)
🌟Location: Balochistan, Pakistan
🌟Rotation: Stay at site, 6–8 day’s vacation after one month

Only candidates interested in working at the above-mentioned location should send their CVs. Interview will be conducted by PlanningP6 expert.

👉🏻Hello@Planningp6.com
👉🏻+923088663797 (WhatsApp Only – Text Massages)

#Hiring #PlanningEngineer #OGDCL #BalochistanPakistan #EngineeringJobs #AJCCompany #PlanningP6 PlanningP6.com

1 month ago | [YT] | 2

PLANNING - P6

💻🔎 FIX PLANNED VALUE AND SCHEDULE % COMPLETE MISMATCH IN PRIMAVERA P6
💻🔎 | WHY PLANNED VALUE DOESN’T MATCH

🕒DURATION: 09 MINUTES
🎞️TUTORIAL: https://youtu.be/CMRK3e_iTCQ

📢📑DESCRIPTION:


Struggling with Planned Value, Plan %, or Schedule % Complete mismatches in Primavera P6?
In this step-by-step tutorial, we’ll walk you through resolving one of the most common issues faced by planning engineers — the mismatch between Planned Value, Schedule % Complete, and Excel S-Curve data.
Whether you're working on man-hours, cost, or units, mismatches between Primavera P6 and Excel reports can lead to inaccurate S-curves, misleading progress metrics, and project reporting errors.
Whether it’s a small timing error or a baseline misconfiguration, this tutorial will help you fix the root causes and produce clean, accurate reports for your project team or client.
Includes tips on Global Change filters, resource assignment views, and fixing date cut-off mismatches during schedule runs.

🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#PrimaveraP6, #PlannedValue, #SchedulePercentComplete, #PlanPercentMismatch, #PrimaveraGlobalChange, #ExcelSCurve, #BaselineSchedule, #ConstructionPlanning, #ProjectControls, #PlanningEngineer, #EarnedValueManagement, #PrimaveraP6Errors, #ManhourLoadedSchedule, #PrimaveraP6Tips, #PrimaveraP6Training, #PrimaveraP6Tutorial #PrimaveraP6, #PlannedValueMismatch, #SchedulePercentCompleteMismatch, #PlanPercentCompleteFix, #ExcelSCurveTutorial, #PrimaveraP6ScheduleIssues, #BudgetedUnitsMismatch, #PrimaveraBaselineFix, #ProjectScheduleCorrection, #ResourceAssignmentError, #PrimaveraP6GlobalChange, #ConstructionScheduleFix, #CostLoadedScheduleFix, #EarnedValueMismatch, #ScheduleProgressMismatch, #ProjectControlsTips, #PlanningBasics, #PrimaveraP6Tips, #ScheduleDataCorrection, #ScheduleUpdateError, #PrimaveraSchedulingErrors, #ConstructionPlanningTips #planningP6 https://youtu.be/CMRK3e_iTCQ

1 month ago | [YT] | 3

PLANNING - P6

💻🔎 HOW TO PREPARE REVISED SCHEDULE IN P6
💻🔎 MAKE REVISED SCHEDULE FOR ANY CHANGES IN P6

🕒DURATION: 14 MINUTES
🎞️TUTORIAL: https://youtu.be/t3iz1Fhhdlg

📢📑DESCRIPTION:

Preparing recovery or revised schedules is a very common task during project execution, monitoring and controlling. When there is a slippage in the project finish forecast date or scope addition or omission or a change in the construction methodology or constructability method, the schedule baseline is no longer effective in the monitoring and controlling process. Therefore, a recovery or revised schedule should be prepared, approved and maintained as a new baseline to monitor and control the project.

🤝🙏: JOIN @PLANNINGP6 FOR MORE:

👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/

📇📼: @PLANNINGP6 PLAYLISTS:

▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...

#primaveraP6 #revisedschedule #projectmanagement #scheduleupdate #constructionmanagement #projectplanning #tutorial #p6tips #scheduling #engineering #learnP6 #projectcontrols #construction #projectmanager #globalchange #activitystatusupdate #timelinebaseline #progressoverride #actualdatesreset #baselinecopy #scenarioplanning #resourceleveling #earnedvaluemanagement #whatifanalysis #montecarlosimulation #criticalpathmethod #precedencediagrammingmethod #constructiontips #pmbok #projectmanagementtraining #projectplanningtips #projectmanagementtools #projectmanagementcertification #p6software #p6hacks #p6bestpractices #maximizep6 #learnprimavera #primaveratraining #constructionplanning #PlanningP6 #Revised_Schedule, #Revised_schedule_Preparation_for_any_change_p6, #primavera_p6_complete https://youtu.be/t3iz1Fhhdlg

1 month ago | [YT] | 1

PLANNING - P6

💻🔎 HOW TO PREPARE SCHEDULE FOR WATER TANK PROJECT IN PRIMAVERA P6
💻🔎 SCHEDULE COMPLETE PROJECT IN P6

🕒DURATION: 01 HOUR & 01 MINUTES
🎞️TUTORIAL: https://youtu.be/_4UA5Dc3d_Q

📢📑DESCRIPTION:

Learn how to effectively schedule a water tank project using Primavera P6. This comprehensive tutorial covers essential steps from project setup to completion. Discover how to create a detailed work breakdown structure (WBS), define activities, establish relationships, assign resources, and track progress. Gain insights into critical path analysis, resource allocation, and cost control. Master the art of creating realistic project schedules and optimizing resource utilization for successful water tank project execution.

#primaverap6 #projectscheduling #projectmanagement #construction #watertank #projectcontrols #engineering #constructionmanagement #projectplanning #watersupplyproject #p6tutorial #projectschedule #watertankproject #constructionplanning #civilengineering #infrastructureproject #projectcontrols #p6training #projectmanagementtools #primaverap6tutorial #watertankproject #projectscheduling #constructionplanning #projectmanagementtips #projectcontrols #civilengineering #infrastructureproject #p6training #watertankconstruction #critical_Path #planningp6 https://youtu.be/_4UA5Dc3d_Q

3 months ago | [YT] | 2