Name - GU3ST Nickname - Bloxy Cola Status - Alive Survivor/killer - Survivor Hybrid - Cyborg + Robloxian •Lore - Bloxy Cola is just getting an upgrade, When all of the sudden F3XBloxxer Killed all of The Scientist and Engineers. But Bloxy Cola Fought F3XBloxxer, And F3X is so powerful that almost no one can defeat him, But Bloxy Cola Fights F3X And Lost Damaging his upgrade. Description- A Robot [slide 3-6 Are Milestones]
Abilities: Blaster Shot [First Ability] •The Blaster can shoot A laser Orb and the ability has 50 seconds to use. Speedblitz Kick [Second Ability] •Speedblitz Kick can make the killer fly while kicked And only has 150 Seconds to use. Punch [Third ability] •Can stun Killers For atleast 5 Seconds and has 30 seconds to use. Charge up [Fourth ability] Bloxy Cola can charge up, But also can heal players when low, Bloxy Cola Can't heal people when low (has 30-50 Seconds to use). X-Ray [Fifth Ability] Can see Players that are on low health. (Has 90 Seconds to use) Fly [Sixth Ability] Bloxy Cola can fly because he's a robot (Can only fly for 10 Seconds) [Has 45 seconds to use]
Voicelines: Spawn - letz Do this :D Stunning the killer - Got you Hitted by the killer - Ow Killed - [Error] Healing The Player/s - I'm glad to heal you (guys) Injured - H3LP
Stamina - 150 Health - 150
Abilities Damage Dealt: First - 30 dmg Second - 250-500 dmg Third - 20 Fourth - No damage Fifth - no damage Sixth - 50 Damage when he gets landed near killer causing Explosion and Having Damage to the killer
F3XBloxxer
Killer Concept
•Name - ST4NZ45
•Survivor/killer - Killer
•Description - A Murderer Who murders Robloxians
•Milestones - [No milestones yet]
Health - 1,575
M1 - Stab
Deals 25 Dmg
Skills
•Skill 1 - Crusher
Deals 30-50 Dmg
•Skill 2 - Headlock
Deals 20 Dmg
•Skill 3 - Multiple Stabbing
Deals 30-50 Dmg
•Skill 4 - Seeing eyes
Detects the Survivors
•Skill 5 - Shadow minions
Spawns minions that deals 10-20 dmg
Voicelines
•Using skill 1
N1C3 TRY BUDDY (NICE TRY BUDDY)
•Stunned
Y0U'R3 G0NN4 P4Y F0R TH4T (YOU'RE GONNA PAY FOR THAT)
•Using skill 2
4H 1 L0V3 TH15 (AH I LOVE THIS)
•Using Skill 3
I L1KE TH15 R0UND (I LIKE THIS ROUND)
•Using Skill 4
1 533 y0u (I see you)
2 days ago (edited) | [YT] | 3
View 1 reply
F3XBloxxer
Me ragebait someone
6 days ago | [YT] | 2
View 2 replies
F3XBloxxer
WH0 12 Th12 G>y?
2 weeks ago | [YT] | 1
View 4 replies
F3XBloxxer
Making @madcivilian ,@SonicDuhFastGuy840 and @Keriii03 Soon (Bad Invincible edit) Just because I'm mid at editing and Gey @steamyducklord
Including mah besto friendo @yourlocal0R30Designer
2 weeks ago (edited) | [YT] | 2
View 5 replies
F3XBloxxer
Draw my oc pls
3 weeks ago | [YT] | 3
View 1 reply
F3XBloxxer
My Oc (But sakened)
[CLICK THE PHOTO TO SEE]
Name - GU3ST
Nickname - Bloxy Cola
Status - Alive
Survivor/killer - Survivor
Hybrid - Cyborg + Robloxian
•Lore - Bloxy Cola is just getting an upgrade, When all of the sudden F3XBloxxer Killed all of The Scientist and Engineers. But Bloxy Cola Fought F3XBloxxer, And F3X is so powerful that almost no one can defeat him, But Bloxy Cola Fights F3X And Lost Damaging his upgrade.
Description- A Robot
[slide 3-6 Are Milestones]
Abilities:
Blaster Shot [First Ability]
•The Blaster can shoot A laser Orb and the ability has 50 seconds to use.
Speedblitz Kick [Second Ability]
•Speedblitz Kick can make the killer fly while kicked And only has 150 Seconds to use.
Punch [Third ability]
•Can stun Killers For atleast 5 Seconds and has 30 seconds to use.
Charge up [Fourth ability]
Bloxy Cola can charge up, But also can heal players when low, Bloxy Cola Can't heal people when low (has 30-50 Seconds to use).
X-Ray [Fifth Ability]
Can see Players that are on low health.
(Has 90 Seconds to use)
Fly [Sixth Ability]
Bloxy Cola can fly because he's a robot (Can only fly for 10 Seconds) [Has 45 seconds to use]
Voicelines:
Spawn - letz Do this :D
Stunning the killer - Got you
Hitted by the killer - Ow
Killed - [Error]
Healing The Player/s - I'm glad to heal you (guys)
Injured - H3LP
Stamina - 150
Health - 150
Abilities Damage Dealt:
First - 30 dmg
Second - 250-500 dmg
Third - 20
Fourth - No damage
Fifth - no damage
Sixth - 50 Damage when he gets landed near killer causing Explosion and Having Damage to the killer
3 weeks ago (edited) | [YT] | 1
View 1 reply
F3XBloxxer
I met an rc (Robloxia:Corruption) Fan
3 weeks ago | [YT] | 2
View 0 replies
F3XBloxxer
This npc is SO CUTE!!!! :D
4 weeks ago | [YT] | 0
View 2 replies
F3XBloxxer
I FINALLY GOT TS 😄😄😄
-5 Hour Grind
1 month ago | [YT] | 2
View 0 replies
Load more