First image is the Google maps street view of the real life location I'm trying to model. The rest is progress so far. Things left to do are painting and detail work.
Well a little picture update on the layout. The track work has been completed. Still operates and look pretty much the same but I swapped in some turnouts that needed to be changed directionally. Also put my first structure on the layout. It's WoW Logistics! It's built out of 1/8 inch and 1/4 mdf. I'm going to paint, weather and add overhead doors eventually but having a built structure definitely adds a more prototypical feel!
On to a newer more efficient use of space layout. Still going with the same industrial park but going to change some turnouts to there proper alignment
Rusty's Railyard -- WSOR Oshkosh subdivision
1 month ago | [YT] | 4
View 0 replies
Rusty's Railyard -- WSOR Oshkosh subdivision
First image is the Google maps street view of the real life location I'm trying to model. The rest is progress so far. Things left to do are painting and detail work.
1 month ago | [YT] | 3
View 0 replies
Rusty's Railyard -- WSOR Oshkosh subdivision
More to come, first ever walthers structure starting to come together. Can anyone guess which kit I'm building?
1 month ago | [YT] | 3
View 0 replies
Rusty's Railyard -- WSOR Oshkosh subdivision
Sent out the track maintenance crew this evening to have them level out some uneven track
8 months ago | [YT] | 5
View 0 replies
Rusty's Railyard -- WSOR Oshkosh subdivision
Well a little picture update on the layout. The track work has been completed. Still operates and look pretty much the same but I swapped in some turnouts that needed to be changed directionally. Also put my first structure on the layout. It's WoW Logistics! It's built out of 1/8 inch and 1/4 mdf. I'm going to paint, weather and add overhead doors eventually but having a built structure definitely adds a more prototypical feel!
9 months ago (edited) | [YT] | 5
View 0 replies
Rusty's Railyard -- WSOR Oshkosh subdivision
On to a newer more efficient use of space layout. Still going with the same industrial park but going to change some turnouts to there proper alignment
10 months ago | [YT] | 11
View 4 replies
Rusty's Railyard -- WSOR Oshkosh subdivision
New switching video tonight with this Dash 8
10 months ago | [YT] | 4
View 0 replies
Rusty's Railyard -- WSOR Oshkosh subdivision
Quiet time means adding a siding time... Shhhhh
11 months ago | [YT] | 1
View 0 replies